← All How-To films

How-To film · 51

The right collection for the job

Change one corrected List quantity and watch the published array and restock pipeline update while the original List and folded ink total stay intact.

49 secCaptions + transcriptGrid 0.63.2

Accessible playback

Follow every narrated step.

English captions (WebVTT)
Read transcript
  1. The right collection preserves the operation that matters.
  2. A List keeps order and history. Six quantities feed the restock pipeline.
  3. The original List still has five items. Its fourth remains twenty-five.
  4. Change only the corrected first quantity, from six to eight.
  5. The Array updates. Restock falls from ninety-three seventy-five to eighty-one twenty-five.
  6. The Set policy still holds, while the Map fold keeps fifty-five units of ink.
  7. Choose by operation. Keep history.

Make the same move

Go from watching to building.

The film shows one cause-and-effect path. These guides, models, and references let you inspect the whole thing.