How-To film · 39
The schedule solves itself
Resolve a source-authored Planning region into relative-time resource lanes, then reveal the makespan, objective, and repair evidence behind the schedule.
Read transcript
- A production schedule is not a calendar someone drags into shape.
- This Calendar surface is explicitly switched to resident Planning, so its axis stays in model-authored hours instead of invented dates.
- Grid solves the source-authored region, groups every assignment by resource, and reserves setup time before the processing bar.
- Beyond bars, Grid shows status, makespan, objective, explored nodes, due dates, and tardiness.
- Change the model and resolve again. The solver owns the schedule, not the Gantt.
Make the same move
Go from watching to building.
The film shows one cause-and-effect path. These guides, models, and references let you inspect the whole thing.