The schedule solves itself

Resolve a source-authored Planning region into relative-time resource lanes, then reveal the makespan, objective, and repair evidence behind the schedule.

59 secCaptions + transcriptGrid 0.63.2

Accessible playback

Follow every narrated step.

English captions (WebVTT)
Read transcript
  1. A production schedule is not a calendar someone drags into shape.
  2. This Calendar surface is explicitly switched to resident Planning, so its axis stays in model-authored hours instead of invented dates.
  3. Grid solves the source-authored region, groups every assignment by resource, and reserves setup time before the processing bar.
  4. Beyond bars, Grid shows status, makespan, objective, explored nodes, due dates, and tardiness.
  5. Change the model and resolve again. The solver owns the schedule, not the Gantt.